When we install the roof garden floor, there are three points as be below: the original waterproof layer must not be damaged; the drainage must be unobstructed; the load-bearing must meet the structural requirements.
The roof is generally waterproofed, so when the joist be fixed, it cannot be connected to the roof with expansion screws directly.Generally, we make the joist into a frame structure, which can improve the stability.
The roof usually already has a slope.When paving, we can combine this slope to establish a drainage channel, the channel shall be unobstructed.
Try to choose a wood plastic composite deck item with high strength and lightness, such as our round hole design floor item TS-03 (150x25mm).The round hole design of this item make it has very high strength and not bulky. The surface of the TS-03 is the 3D embossing surface, it now get very good feedback in our sales for its enjoyable touch.And the deep wood grain surface will always be kept in long-term use.